Preparing a study on construction of wastewater treatment plant and sewage network system in Svrake, Bosnia and Herzegovina
Grant: Preparing a study on construction of wastewater treatment plant and sewage network system in Svrake, Bosnia and Herzegovina
Implementation period: 2012
Implementing partner: Hydroprojekt CZ a.s
Budget for the year 2012: 316 000 CZK
Implementation period: 2012
Implementing partner: Hydroprojekt CZ a.s
Budget for the year 2012: 316 000 CZK
CzDA-BA-2012-5-14022
(IDENTIFIKAČNÍ ČÍSLO)
(IDENTIFIKAČNÍ ČÍSLO)
316 000 CZK
(CELKOVÝ PŘEDPOKLÁDANÝ ROZPOČET)
(CELKOVÝ PŘEDPOKLÁDANÝ ROZPOČET)
2012
(DOBA REALIZACE)
(DOBA REALIZACE)
The Czech partner used its experience in water supply and sanitation for preparing a feasibility study on construction of wastewater treatment plant and sewage network system in Svrake (municipality of Vogošća).